company news
Construction Coatings
2008-04-08 22:24:21
(has been browse 208 times)
◆ Construction Methods:Shuachu or spraying;
◆ Construction conditions:
■ before use, you paint on the surface to the bottom of the full uniform mixing
■ please use accurate ratio curing agent according to the actual construction and the environment and good diluent, and then mixing uniform
■ unused paint can not rewind the original drums
■ The use mixes impurities, it appropriate to use 200 mesh filter then put into use Shawang
◆ drying time:
■ Table dry: 45 minutes
■ pragmatic: 5 hours
■-Tu: a coating drying time before at least six hours before re-Tu. If low temperatures, corresponding to re-extend the time Tu
◆ maintenance time: 7 days / 25 ℃; if lower temperatures, appropriate extension of the time
◆ clean: Painting and Coating stopped midway after, and timely use of this product supporting all the cleaning apparatus diluent
◆ storage:
■ confined stored in a cool, dry place
■ away from open flame and heat
◆ security matters:
■ place where children can not reach
■ Construction should wear protective equipment and to avoid fire
■ use and waiting to be process, we need to ensure good ventilation environment